Keyword: Category: Tag: Sort By:


Clear Search

Search Terms:
Category: All Images
7 results found

Col. Shawn Campbell speaks after taking command of the 10th Air Base Wing June 20, 2017, at the U.S. Air Force Academy. (U.S. Air Force photo/Darcie Ibidapo)
Download Full Image Photo Details
Defenders assigned to 10th Security Forces Squadron collect donations as part of the Air Force Assistance Fund campaign at the U.S. Air Force Academy, Colo., May 12, 2017. Seventeen volunteers from the squadron washed car windshields at the Academy Shopette to solicit donations. The squadron raised more than $3,300 for the AFAF. (Courtesy photo/Chief Master Sgt. Shadd McKee)
Download Full Image Photo Details
Col. Troy Dunn. commander of the 10th Air Base Wing at the U.S. Air Force Academy, speaks from the stage in Arnold Hall Nov. 4, 2016. Dunn hosted an all call to to discuss his priorities as commander, thank his team of Total Force Airmen, and advocate for the care and concern of Airmen at the wing. (U.S. Air Force photo/Jason Gutierrez)
Download Full Image Photo Details
Col. Troy Dunn, commander of the 10th Air Base Wing, speaks from the stage in Arnold Hall Nov. 4, 2016 at the U.S. Air Force Academy. Dunn hosted an all call to thank the Total Force Airmen assigned to the wing for their daily efforts and discuss his priorities as the commander. (U.S. Air Force photo/Jason Gutierrez)
Download Full Image Photo Details
Firefighters from the 10th Civil Engineer Squadron Fire Department douse a structure during a fire-response exercise at the U.S. Air Force Academy. Academy firefighters will compete in the Firefighter Would Championship beginning Oct. 24, 2016 in Montgomery, Alabama. (U.S. Air Force photo/Jason Gutierrez)
Download Full Image Photo Details
The northbound lanes of the Tri-intersection Bridge on South Gate Blvd. will be closed from Aug. 8 to Oct. 31 to repair the damaged bridge deck. The southbound bridge will accommodate two-way traffic during construction.
Download Full Image Photo Details
The northbound lanes of the Tri-intersection Bridge on South Gate Blvd. will be closed from Aug. 8 to Oct. 31 to repair the damaged bridge deck. The southbound bridge will accommodate two-way traffic during construction.
Download Full Image Photo Details