HomeNewsPhotos
Fixing the Academy
Cadet 4th Class Cassandra Dunn and two other cadets walk along a covered walkway near the McDermott Library at the Air Force Academy Jan. 12, 2011. A $4.3-million construction project to repair the roof of the library and other sections of Fairchild Hall is estimated to be finished in October. Ongoing construction at the Academy is valued at $143.3 million. (U.S. Air Force photo/Mike Kaplan)

Download Image: Full Size (2.77 MB)
Photo by:  |  VIRIN: 110112-F-0558K-837.JPG